suggested Maintenance Routine

We have installed a Stained concrete Floor system for the main walkways at a Fairly busy Healthclub.

The base coat sealer was a 2 coat process by Scofield Systems called Cementone :Clear Sealer. We waited 72 Hoyurs and the installed 2 coats of Shine Tyme Wax. Each night the floor is Dust mopped and then damp mopped. How often and how many wax coats should be reapplied??? Is there a better choice for the high volume commercail floor finish??

Related